Skip to main content

TECEdrainline

For questions:
info@tece.co.uk

TECEdrainline

TECEdrainline – Assembly (Concrete Floors)

The classic composite seal, optimally solved

TECEdrainline in Verbund mit den Seal System Abdichtungsprodukten

Safe installation within the composite seal is ensured with the trusted sealing solution from the Seal System range.

The Seal System sealing tape, included, provides complete confidence during installation. With Seal System, you can rely on full compatibility between the composite sealing products, the sealing tapes and the TECEdrainline shower channels.

Installation of this system is made even easier with the optional mounting feet, which simplify the positioning and alignment of the channel.

The installation steps

Schritt 1 bei der Montage der Duschrinne TECEdrainline
1 TECEdrainline with stainless steel flange and Seal System sealing tape
2 TECEdrainline trap
3 TECEdrainline assembly feet
4 Edge insulation strips for sound insulation
5 Drainbase sound insulation mat for sound-proofing

Step 1: Before inserting the shower channel, the shower area is carefully prepared by installing lateral edge insulation strips and a sound insulation mat to reduce impact noise. The channel is then positioned, aligned and connected. The height can be easily adjusted using the optionally available assembly feet.

Schritt 2 der Montage der Duschrinne TECEdrainline

Step 2: The screed is laid with a gradient of 1 to 2 percent towards the channel to ensure optimal drainage.

Schritt 3 der Montage der Duschrinne TECEdrainline

Step 3: The Seal System sealing tape is applied so that it overlaps both the shower channel flange and the screed.

Schritt 4 der Montage der Duschrinne TECEdrainline

Step 4: Afterwards, the first layer of the composite seal is applied.

Schritt 5 der Montage der Duschrinne TECEdrainline

Step 5: The composite seal can now be applied completely.

Schritt 6 der Montage der Duschrinne TECEdrainline

Step 6: After tiling and grouting, the cover is inserted into the channel body. This concludes the assembly. To enable thorough cleaning, the cover can also be removed any time after assembly and replaced again.